![St. Mary Medical Center – Surgical Pavilion (2015-16)](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/St.-Mary-Medical-Center-Surgical-Pavilion-4172-Exterior-3-300x118-1.jpg)
St. Mary Medical Center – Surgical Pavilion (2015-16)
The Surgical Pavilion at St. Mary Medical Center started in the late spring of 2014 and was completed at the end of 2015.
![Community Hospital – Emergency Department Vertical Expansion](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/Community-Hosptial-ED-Expansion-300x105-1.jpg)
Community Hospital – Emergency Department Vertical Expansion
Community Hospital in Munster, IN expanded their facility with a 5-story expansion above their existing 2-story emergency department in 2013.
![Methodist Northlake Campus – Emergency Department & ICU Renovations](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/Methodist-Hospital-Northlake-1-300x118-1.jpg)
Methodist Northlake Campus – Emergency Department & ICU Renovations
Methodist Hospital Northlake Campus is undergoing a $10 million project that expands and revamps its emergency and intensive care units.
![Highland Public Safety](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/Highland-Public-Safety-Facility-1-1-300x118-1.jpg)
Highland Public Safety
Highland, IN built a brand new state-of-the-art Public Safety facility to house the Police Department in 2015.
![Protsman Elementary School](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/Protsman-Exterior-2-300x105-1.jpg)
Protsman Elementary School
Protsman Elementary School located in Dyer, IN is part of the Lake Central School Corporation, and constructed a new 124,000 sq. ft. facility in 2012-13.
![Valparaiso University – Harre Student Union](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/project02-300x118-1.jpg)
Valparaiso University – Harre Student Union
August 2007 – March 2008
HVAC – Sheet metal – Plumbing
LEED Silver Project
![Centier Bank Corporate Center](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/centier-bank-01-1.jpg)
Centier Bank Corporate Center
March 2007 – August 2008
Berglund Construction Company selected Arctic Engineering to provide for all condensate water and heating configurations and HVAC equipment installation.
![St. Margaret – Central Utility Plant Expansion](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/st-margaret-hospital-01-300x118-1.jpg)
St. Margaret – Central Utility Plant Expansion
Responsible for serving the entire Dyer campus with heating and cooling; the Central Utility Plant consisted of the Power House, Boiler Plant, and Chiller Plant.
![Uptown Artist Lofts, Michigan City](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/Uptown-Artist-Lofts-1-1-300x139-1.jpg)
Uptown Artist Lofts, Michigan City
Artspace Uptown Artist Lofts is a mixed-use project with 44 affordable live/work units for artists and their families, with ground-floor studio and commercial space.
![Urschel Laboratories – New Facility](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/St.-Mary-Medical-Center-Surgical-Pavilion-4172-Exterior-3-2-300x118-1.jpg)
Urschel Laboratories – New Facility
Urschel Laboratories; is a world leader in the designing, manufacturing and selling of precision food-cutting equipment.
![CN – Fueling Station and Office Building](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/CN-Railroard-Fueling-Station-3-300x118-1.jpg)
CN – Fueling Station and Office Building
Arctic Engineering provided HVAC (sheetmetal & piping) and plumbing work for a new office building and Fueling Station...
![Indiana University Northwest – Chiller Replacement & Moraine Cafeteria renovations](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/IU-Northwest-1-300x105-1.jpg)
Indiana University Northwest – Chiller Replacement & Moraine Cafeteria renovations
Arctic Engineering has provided HVAC work at the Indiana University Northwest campus for several projects.
![Blue Chip Casino](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/project01-300x118-1.jpg)
Blue Chip Casino
March 2007 – Dec 2008
Arctic Engineering was selected to provide all plumbing work for the nautical-inspired design of the tallest building built in Indiana in 2009; Blue Chip Casino & Hotel located in Michigan City.
![Cabela’s Specialty Retail Showroom – HVAC – Plumbing – Sheetmetal](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/project03-300x118-1.jpg)
Cabela’s Specialty Retail Showroom – HVAC – Plumbing – Sheetmetal
March 2007 – November 2007
This 185,000 sq ft facility had a very aggressive construction schedule; 8 months from start to finish.
![St. Catherine Hospital – Chiller Plant – New Building & Chilled Water Distribution System](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/st-catherine-hospital-01-300x118-1.jpg)
St. Catherine Hospital – Chiller Plant – New Building & Chilled Water Distribution System
Gough Incorporated was awarded the general contract for the building construction of this project.
![Community Hospital – ED Modernization](https://arcticengineering.com/wp-content/uploads/sites/7/2024/01/community-hospital-01-300x118-1.jpg)
Community Hospital – ED Modernization
October 2008 – January 2009
In preparation for this project, two years prior Arctic Engineering provided and installed a complete replacement of the chiller plant servicing the entire campus.